fb
Garrison Park – Modesto Area 2 Storm Drain

Garrison Park – Modesto Area 2 Storm Drain

RRM Design Group was selected to prepare a 35% Design Report to develop innovative and cost effective methods for reducing flooding and removing sanitary sewer cross connections in northwest Modesto. RRM evaluated numerous options to convey, clean, store, and dispose...
Surfer’s Point Managed Shoreline Retreat and Trail

Surfer’s Point Managed Shoreline Retreat and Trail

Surfer’s Point Managed Shoreline Retreat and Trail The City of Ventura hired RRM Design Group to prepare design development and construction drawings for the Managed Shoreline Retreat of Surfer’s Point. Damaged by El Nino storms of 1999, Surfer’s Point required...